Monday, April 27, 2009

Digital Divide in India

India comprises federal and state government with more then 3000 elected members from different houses from 29 states and 6 union territories. The population of India is more than 1 billion and internet penetration and usage in India percent is low. 142.7 million Mobile subscribers were reported in 2006 and a mobile penetration rate is 13%, the market in India still remains largely untapped. According to the study, television penetration in India is expected to increase 42 per cent by 2005 to 110 million homes, in comparison to the 79 million homes as of now. Cable connectivity, too, is likely to rise to 61 million homes by 2005 as against the current 38 million homes. In terms of percentage there is big digital divide in India.

There is great gap between users of ICT in India. India also has very high degree of social exclusion and society is divided in upper caste, backward caste and lower caste. Their old methods have not been completely washed away. Many people still believe in the caste system and treat others based on their caste. These problems lead to a more closed off climate where ICT can not flourish as greatly. The literacy rate is not much high in India but there is big human capital which is asset and several key advantages like: a large English-speaking population and world-class education, research and management institutions a direct result of investment in self-reliance in science and technology. The Indian Institutes of Technology and engineering colleges in many cities around India to produce good technical skills, the government have a computer policy to encourage R&D in personal computers.

Government of India attempt to increase ICT interaction with the people through E-government. Allowing Indian citizens to use the internet to perform tasks like getting and submitting forms. There have been case studies done on the benefits of E-government in India using the computerization of land records in state of Karnataka. Some other states such as Madhya Pradesh and Andhra Pradesh have started to introduce applications which allow citizens to have faster and more transparent access to government services for example, the provision of information on laws and regulations, and the procuring of licenses and official documents online. The major problem is with corruption and transparency. Many of the local officials push back on the E-government front because the local officials know once those systems are in place they won't be able to take money under the table. The transparency that E-government provides gets in their way and makes it more difficult to cover their tracks. E-government will allow more of the government operations to be visible and help stem out corruption.


For reducing the digital divide I would suggest-

• To make policy which could connect and bridge the gap between E-government and digital divide.
• The linguist barriers are should actively address by the state governments. There are 12 languages for different sates and these all should have portal in widely in people used language.
• For reducing the digital divide there should be subsidies for poor and backward people so they could afford the technology.
• The portal and application should be user friendly so people with little literacy also can use.
• There should be fund allocation in every five year plan for bridge the gap.
• Private sectors also ask to encourage to bride digital divide.
• Public should give some incentives to engage for reducing digital divide.


Data Source:

http://www.domainb.com/economy/general/nov_2001/20011106_tv.html
http://www.financialexpress.com/news/india-best-bet-for-mobile-users/195400/

Friday, February 27, 2009

The Way

When I find a way
Then I feel a way
That makes to say
How I have to make
How I have to take
When I find a way
Then I feel a way
I am happy to say
I feel I have to make
The energy is high
The power is fly
When I find a way
Then I feel a way
The season is dry
The rain is shy
Which force a pain
Which make a difficult
When I find a way
Then I feel a way

11pm 27th Feb, 09
Bunder

Friday, January 23, 2009

War of Emotions

The lasting pain in heart
The desire to achieve a height
The wind which need to fly
The power which need to test
Make many pains of life.

The love to world makes thought
The life for the sake live
The heat for the germination
The rain for the water
Make many smiles of life.

The slowly lasting pain vanish
The height achieved
The wind helps in fly
The power proved
Make many challenges of life.

The war I won
The love I got
The life I live
I always won emotion war which I love to live.

ADOPTION OF AGRICULTURE TECHNOLOGY BEFORE AND AFTER THE INTRODUCTION OF WATERSHED MANAGEMENT PROJECT

ADOPTION OF AGRICULTURE TECHNOLOGY BEFORE AND AFTER THE INTRODUCTION OF WATERSHED MANAGEMENT PROJECT

Abstract:

This paper is intended to show the difference in agriculture technology before and after the introduction of watershed management project in the Pali village of Dehradun. There was change in time disposition pattern of the farmers, land-use pattern, agriculture tools use, cash crop production and fruits trees. The forest cover and irrigated land has been increased. Introduction of improved type of breed cattle helped the villagers in increasing the milk production. After the introduction of fodder grasses and soil conservation in the village, the soil erosion reduced. The fuel wood dependency on the forest reduced due to introduction of bio-gass plant by project authority in the village .All the factors adopted by the farmers in the village helped them to increase the crop production and improve their economic condition after the introduction of the project in the village.
Introduction:

India has about 14.8 crore ha of land under rain-fed farming systems. Degradation and denudation of such rain-fed lands is one of the major causes of ecological imbalance in the country. Integrated development of such lands on the principles of watershed management holds the key to ecological health of country, now as a matter of policy the GOI has decided to rehabilate the rain-fed and dry-land areas .
The ultimate objective of watershed management is to develop natural resources base ,sustain its productivity, improve economic status of villagers and endeavor restoration of ecological balance.
To stimulate and promote peoples participation in watershed development project planning, project formulation, implementation, post-project management of project assets.
Village women play important role in farming systems, rearing livestock, fuel-wood and fodder collection, agricultural operations etc. besides house keeping, cooking and household chores. Public participation is incomplete without women’s participation.

Main objectives of Doon valley project are as follows.
1. To stop environmental degradation in Doon valley and to revert this process as for as possible.
2. To involve community participation in planning implementation and each step of management..
3. To make life of local people better and to encourage the participation for management of all natural resources by integrated and multifaceted method.
4. To develop human resources of the area.

Process of sustainable development:

The management of watershed in Doon valley project is based on participation. The village is considered as the basic unit in which community participation is kept at central point for planning implementation and sustainable use of natural resources.

Participating Rural Appraisal (PRA) develops rural plans. This is a participatory action and learning process in which village prepares and maps for development of village by themselves. On the basis of this village plan, annual working plan of the project is prepared. This is anticipated that at the end, watershed management will become program of villagers and project staff will act just as facilitation.
Doon valley project is contributing in the following ways:
1. Management of natural resources on the basis of sustainability.
2. Improvement in living standard of rural communities.
3. Increase in supply and availability of fruits, fuel wood and fodder.
4. Increase in productivity from cattle.
5. Increase in forest cover.
6. Decrease in surface runoff.
7. Conservation of surface water.
8. Increase in sources of minor irrigation and availability of drinking water.
9. Increase in productivity of land and water resources.
10. Encouraging rural communities for self-dependency.
Project authorities are connecting non-governmental origination Mahila Mangal Dal and other voluntary organization in planing and implementation of the project for community participation and different programs of the project, local organization such as Gramya Resources Management Association (GARIMA) users group and Samaj Sahyata Samuh are also encouraged.
Introduction of village:
Pali Majola is situated in the north of Bhogpur and has 41.238ha area. This village falls in development block Doiwala, Thesil-Dehradun and micro-watershed is Peronapani of Rishikesh division in Distt. Dehradun. It has total population of 129 people and consists of 33 men, 31 women, 43 boys and 22 girls.
It has 18ha forest area, 16.64ha agriculture area, 3.44ha orchard land and 2 ha barren land or wasteland. The boundaries of village are made in east Kuarsi, in west Nanekot, in north Khaldhan and in south Bhogpur.
Methodology:
1. Baseline studies:
Baseline studies consist of a description of those aspects of the physical, biological and social environment, which could be affected by a proposed development. They provide information as before project conditions that used to be established for the identification and prediction of impacts that could be made.
Baseline data was collected from sub project office of Rishikesh Dimsia. This data provided important ‘before project’ information about the village.
2. Survey of the village:
Village complex was surveyed for getting ‘after project’ information about the village. People were interviewed for getting a clean picture of the changes that have occurred in the village. Other tools were also used while in survey process. To survey the village the parametric factors are divided into three broad groups.

Result & Discussion:
The village has been variously affected by the activities undertaken by project authorities. These impacts were studied by collection of data.
Impact studied through data collection:

First, we discuss the impact observed while collection of data about the conditions before and after project implementation.

1. Traditional skill:
The traditional skill is important factor to see the skill of the farmers in the village.

Table-1: Traditional skill

S.No. Skill Households(no.)
Before project After project
1 Black smith 1 1
2 Carpenter 1 1
3 Goldsmith - -
4 Tailor 1 1
After introduction of the project there was no change in the traditional skill of the farmers(Table-1).
2. Time Disposition pattern
Before Project
(a) Collection of fuel and fodder 3-6 hrs/day
(b) Agriculture (fuel ploughing only) (Avg. 2-3 hrs/day)
(c) Collecting drinking water (Avg. 1 hr/day)
(d) Upkeeping of animals [Avg. 1 hr/ day)

After project:
Day to day life has hardly been affected by the project. However, in case of fuel and fodder, compared to previous condition when round the year villagers had to go far away, now they can collect grasses and fodder grown within or in the vicinity of the village. Many nutritious grasses and fodder species are being planted there.

3. Agriculture:

Table-2: Different land uses
Land type 1997 (ha) 2000 (ha)
Irrigated 2.00 10.00
Unirrigated 14.64 6.64
Orchard 3.44 20.44
Barren 2.00 1.00
Civil land 22.13 6.13
Reserve forest 18.00 20.00


The irrigated, orchard and reserve forestland increase barren, unirrigated and civil land reduces after introduction of project( Table-2).
Table-3: Different types of Crop
Land Type Kharif Rabi Zaid
Irrigated Paddy Wheat Maize
Unirrigated Maize, Mandua, Pulses Wheat

Crop rotation has not been affected by the project Table-3).

Households using new agriculture practices/technologies
Table-4: Agricultural tools
S.No. Item Before project After Project
1. Line sowing - -
2. Sickle - -
3. Thresher - 1
4. Green manure - -
5. Fertilizer - 21
6. HYV 10 20
After introduction of the project there was significant difference in agricultural tools (Table-4).
4. Cash crop

There are hardly any cash crop grown. People grow these crops but these crops are consumed wholly by the people of the village with no significant income to the village. Project has not done much in this direction except motivating people to adopt growing cash crops.

5. Irrigation:
Almost all of the irrigated area is irrigated by narrow open canal called ‘Guls’. Before Project, there was a total length of 3 km. of Kachcha guls. The kachcha guls have been made pucca by project authorities. Till the date when data was collected, 2-km. Of this had been converted into pucca guls. Various barsati tanks have been constructed. Runoff harvesting tanks have been constructed. Old tanks have been repaired.

Field trails of various crops such as rapeseed, soybean, lintel, pea etc. were conducted. This has raised enthusiasm among villagers. Various agricultural implements have been distributed among villagers such as winnowing fan, spray 7 machine and plows etc. 4 compost pits have been established in the village. Various improved grass varieties have been planted o terraces.

6. Horticulture
Fruits trees on homestead

Before Project-152 (mango, lemon, orange)
After Project- Hundreds of fruit plants have been distributed among villagers; with about 30% success rate. Now people have begun growing jackfruit, banana, peach, plum, walnut etc.
Before project die back and fungal diseases affected most of the fruit trees. But now fungicides etc. are being used by villagers, which is showing improvement. But still there is no sighting of large-scale fruit production. There are no well-established orchards even after the project implementation. Whatever fruits are produced, are consumed by the villagers.

But a progress can be anticipated as the plants, which have been planted have not reached production stage.

Vegetable crops bare grown in the village, but only for domestic use. Negligible amount of vegetables is sold in the market.

7. Forestry:
As forestry is a long-term investment, instantaneous results are difficult to quantity. Still promising progress is being made, in and around village. Seedlings are being distributed among the villagers. Various species are being encouraged. These are bamboos, mulberry, pilkhan, toon, khair, jamun, ber, etc.

Civil soyam forest has plantation area of reserve forest, which is around 18ha.

Benefits drawn from the forest are fuel, fodder and bamboos for basket making. However due to project activities and vigorous plantation works, dependency on reserve forest is decreasing

A. Per day average consumption of fodder by

Cow : 26 kg
Buffalo : 30 kg
Calf : 12Kg

B. Per day average milk production

Before project: Cow : 3 litre/day
Buffalo : 6 litre/day
After project: Same as before

C. Average selling of milk and milk products: 4.00 litre/day/family

D. No. of farmers growing green fodder:

Before Project : Nil
After Project : 15

E. Households having chaff cutters(No.):

Before Project : Nil
After Project : 18


8. Soil conservation:

Before Project: Various drains/gadheras were causing large amount of soil erosion, in and around the village. These are Mahadev Khala and Bangali Khala. Erosion was of E3 class.

After Project: A vigorous campaigning was carried out for soil conservation. The soil conservation practices that have been taken in use are gully plugging, construction of brushwood check dams, loose stone check dams, crate wire dams, improving conditions of agricultural terraces and construction of masonry dams. Cuttings of Rambans have been planted along water channels. Soil conservation measures along riverbanks have also been undertaken. Now soil has settled along these drains and rich vegetation is coming on this soil. Erosion has come down to E1 Class.

9. Energy conservation:
Table-5:Fuel consumption table according to seasons
Season 1997 (kg) 2000 (Kg)
Summer 8.0 4.0
Rain 10.0 7.0
Winter 21.6 15.1
Total 39.6 26.1

Table-5 shows the fuel consumption of the villagers according to season and fuel consumption have been reduced because now the farmers are using the bio-gass plants.

As it is perceived that villagers has drawn many benefits from this project. Progress has been achieved in all components of the project, which are forestry, energy conservation, horticulture, animal husbandry, agriculture, and minor irrigation. People have been involved in project activities for utilisation of manpower of the village as well as for imparting the feeling of oneness among them.
Agriculture of the village is also getting improved day by day. Water harvesting tanks and improved guls are nourishing crops efficiently. Area under commercial crops is increasing. Number of household using Fertilisers and high yield varieties is also increasing. Area under irrigation got increased, credit to the project implementation. Barren land is reclaimed.
Horticulture in the area is taking giant leaps. Previously the numbers of fruit trees were very less. Now fruit trees of various varieties have been planted. Disease affected trees have been treated by pesticides and fungicides. But, newly planted trees yet to bear fruits. The production is anticipated to be good in the future.

Community forestry is getting a boost by the project. Hundreds of trees of domestic and commercial purpose are being planted within or in the vicinity of the village. Reducing pressure on the reserved forest will show its effect in the coming year.

References:
Anon.1997.Areport from Directorate of Watershed Management .Indira Nagar Colony, Dehradun, U.P.
Anon.1997.village Plan of Pali Vilage, Doon Valley Integrated Watershed management Project Rishikesh division from Director of Watershed Management, Dehradun,U.P.
Mukrjee.N. 1993. Participatory Rural Appraisal: Methodology and Application. New Delhi.

Sunday, December 28, 2008

News Published from the Neatherlands

The following news which published from ISS, The Neatherlands about my books in news letter- ISS alumnus Dr Hishmi Jamil Husain has recently had two books published. The first one is entitled Resettlement and Rehabilitation Policy for Mass Entitlements: Dam Affected People. It concerns the resettlement and rehabilitation of peopld affected by the Narmada and Tehri dam projects. The second book is entitled Lithology & Soil Characteristics Related to Forest Vegetation and provides in-depth knowledge to managers, foresters and land users about the content and nature of minerals present in the soil in diagnosing the fertility status and other soil-plant-parent material relationship in forestry.

Source: http://www.iss.nl/Alumni/Alumni-newsletter/Alumni-Newsletter-No-7

Saturday, December 27, 2008

Happy

When I love I love like a child
When I hate I hate like an old man
How I need to think
How I hurt when feel to think
I hurt to see poor
I hurt to see unhappy faces
How I need to think
How I hurt when feel to think
My world is love
My life is work
When I love I love like a child
When I hate I hate like an old man
I think I am Happy
I feel I am Happy
I love trees
I love birds
I love mountains
I love rivers
When I love I love like a child
When I hate I hate like an old man
I think I am Happy
I feel I am Happy
I love to all

7.40pm
27th December, 08
Bunder Camp
India

Tuesday, October 28, 2008

Barriers to Innovation – The five mega-barriers

Barrier 1 (Economic): Governmental interference in the regulation of the telecom sector stifling competition
Description
There is the need to create a fair and competitive regulatory terrain to enhance pro-competitive investment in the telecom sector in pursuance of e-gov agenda. The National Communications Authority (NCA,) the Regulator, faces interference from governmental sector in the management of spectrum and issuance of value-added licences thus thwarting its effort to independently regulate the sector and attract potential investors.
Why it is a barrier
Telecom reform, the world over is promoting the participation of the private sector in investments in a liberalised and transparent environment. The lack of regulatory openness frustrates investment in value added services sector to enhance e-gov application.
Why it is critical
Investors in the telecom sector are suspicious of governmental interference which might lead to investment expropriation and depreciation. There is therefore the need to create a balanced environment of comfort and safety to avoid the fear of the country losing out as an ICT hub for the sub-region.
Underlying tensions
Competitors in the field of ICT want maximum protection for their investments and do not want to be discriminated against in their effort to gain substantial market share. Government does also want a say.
Proposed solutions
Seek amendment to existing Act to make the Regulator autonomous; additionally to organise a workshop for stakeholders to distinguish between policy making for government and implementation process so the Regulator can be empowered to operate independently.
Risks and Rewards of solution
The anticipated risk is that the government may consider the move as an infringement on its moderating powers.
The reward is that there would be the likelihood of private sector investment growth in the absence of fear of investment expropriation.

Barrier 2 (Technological) : Inability of the civil service to attract ICT professionals
Description
The lack of skilled ICT personnel in the civil service thwarts efforts at implementing ICT policies and strategies. The negative impact is the inability of government to deploy ICT in house to promote e-gov.
Why it is a barrier
Attempts at closing the digital divide calls for pro-active application of ICT in governance to enhance efficiency in service delivery. In this regard the ICT “supply side” involvement in the process is crucial.
Why it is critical
Government is the major investor in ICT in developing economies. It appears tragic that ICT tools are underutilised because of lack of skilled professionals and services delivery remain slow because manually done.
Underlying tensions
Attempts are made to outsource all ICT initiatives. The external professionals and the internal staff lack cohesion and unity of purpose. Computers sit on desks as toys and networks don’t talk to each other.
Proposed solutions
Propose the development of a scheme of service to indicate clear job content, career path, promotional avenues, and attractive remuneration package to help attract and create a professional class for ICT in the civil service. Retrain the “demand side” staff.
Make the acquisition of basic ICT skills a condition precedent to entry into the service. A long term strategy and change management.
Risks and Rewards of solution
Risk- Resistance to change management from within is likely to be encountered.
The benefits to the service will be enormous as ICT professionals in the class of CIOs can gain entry into the service and meaningfully support the e-gov implementation process.
Barrier 3(Demographic): Rampant issuance of fake passport (Corruption)
Description
There is a high tendency of fake passport issuance (identity theft) in African countries making the genuine traveller undergo unnecessary scrutiny on identity check at international airports. Meanwhile other identification projects are on going on separate platforms.
Why it’s a barrier
It erodes investor confidence in the economy as a security issue.
Why it is critical
Identification and verification of persons are security issues crucial to be addressed for the successful deployment of e-gov yet no cohesive attempt made to address this issue of secured identity of the populace.
Underlying tensions
Low classification of state at national and international security levels.
Proposed solutions
Promulgation of data protection bill to give legal backing.
Introduction of 3G biometrics and identification technology.
Risks and Rewards of solution
Budgetary constraints to the state a potential risk to proposal.
The reward is a secured integrated national identity scheme to enhance security and investment confidence of the country.

Barrier 4 : Political - There is no strong federal Strategy for the development of eGovernance
Description
There is no strong eGovernance Strategy like in Japan. There are only initiatives, as for example the portal or recommendations for standards. Where is a global vision?
Why it is a barrier
A global strategy, framework and budgets are mandatory.
Why is it critical
Very critical. The initiative for launching a comprehensive eGovernance programme has to come from the Federal Government. Regions and cities are still waiting.
Underlying tensions
Political compromises resulting in the lost of the importance of this Strategy
Proposed solutions
Regions and cities have to exert more pressure on Federal Government.
Risks and Rewards of solution
The risk is to obtain an inadequate or inapplicable Strategy.
The reward is that eGovernance can take off.
Barrier 5 : Structural – Top head Information System is not homogenous and interoperable !
Description
Federal Departments ICTs (Finance, Army etc.,) are technically isolated, like Silos. The more advanced federal office is the OFS (Federal Office of Statistics).
Why it is a barrier
Historically lack of collaboration and co-ordination.
Why is it critical
This situation compromises automation of transversal processes inside the federal Information System. Furthermore, this non-homogeneity compromises also the technical standardization of the electronic exchanges of the other stakeholders, private companies, local and regional governments. They need a unique federal entry point.
Underlying tensions
Internal protectionism of the federal departments.
Proposed solutions
Introduction of standards and wide usage of web services inside federal departments and other public and private partners.
Risks and Rewards of solution
Risk is to wait a very long time!
Modernization of the eGovernance of the federal Government itself.